Adjustable Jack Posts : F.A.Q.

Build a permanent steel support post with our DIY jack post parts. You supply the pipe, we supply the screw adjuster and plates. This page covers choosing parts, cutting the pipe to length, and installing the post the right way, for both contractors and homeowners.

Choosing Parts

What is a DIY adjustable jack post?

It's a permanent steel post that supports a beam or girder in a basement or crawl space. You buy steel pipe locally, then add our screw adjuster and top/base plates. The adjuster lets you fine-tune the height and snug the post tight against the beam.

What parts do I need?

To save a step, buy the adjuster and H plate together: 3" 11 Gauge Adjuster with H Plate or 3-1/2" Schedule 40 Adjuster with H Plate.

Which adjuster should I choose: 3" 11 gauge or 3-1/2" Schedule 40?

Match the adjuster to the pipe you are using:

  • 3" 11 Gauge: For 3" outside diameter (O.D.) 11 gauge steel tube. Fits most typical residential posts.
  • 3-1/2" Schedule 40: For 3-1/2" O.D. Schedule 40 pipe (steel suppliers call this 3" nominal Schedule 40). Use it for heavier loads, or when your engineer or inspector calls for Schedule 40.

Schedule 40 pipe has a thicker wall than 11 gauge tube. If you aren't sure which one your job needs, ask your engineer or building inspector before you buy pipe.

Where do I get the pipe?

Any local steel supplier or metal yard. Ask for 3" O.D. 11 gauge tube or 3" nominal Schedule 40 pipe (3-1/2" O.D.). Most yards will cut it to length for you, so bring your measurements.

What's the difference between the H plate and the 4x6 standard plate?

  • H Plate: Designed to be welded onto the pipe. The H tabs bend over for a snug fit, and the plate has nail holes plus four 3/8" bolt holes for fastening to the beam or footing.
  • 4x6 Standard Plate: A flat 4" x 6" plate with four punched holes. A simple, low-cost choice for the base.

Sizing & Cutting

How do I measure for my post?

  1. Measure from the top of the footing or floor to the bottom of the beam, at the exact spot the post will stand.
  2. If the beam is being held up temporarily, measure with it at the height you want it to stay.
  3. Measure twice. Floors and beams are rarely perfectly level, and even 1/4 inch matters.

How much do I cut off the pipe?

Cut the pipe 3 inches shorter than the finished post height you need. That leaves room for the plate and adjuster to fit snugly.

  • 72" post: cut pipe to 69"
  • 75" post: cut pipe to 72"
  • 84" post: cut pipe to 81"
  • 96" post: cut pipe to 93"

How far will the post adjust?

Up to 4 inches. If you need more than that, cut a longer pipe instead of running the adjuster out further.

Installation

How do I install a jack post?

  1. Temporarily support the beam if it is carrying load or needs to come up.
  2. Measure and cut the pipe (3" shorter than the finished height).
  3. Weld the plates to the pipe as needed. No welder? A local fab or welding shop can usually do this when they cut the pipe.
  4. Set the post on a solid footing, directly under the beam.
  5. Check plumb on two sides with a level.
  6. Turn the adjuster until the top plate is snug against the beam.
  7. Fasten the top plate to the beam (nails or 3/8" bolts) and the base to the footing, then check plumb again.

Do I need a footing under the post?

In most cases, yes. A typical basement floor slab is thin and is not built to carry the concentrated load of a post. A permanent post should sit on a proper footing. Your local building code sets the footing size, so check with your building department or engineer.

Can I use the adjuster to raise a sagging beam?

The adjuster is for fine-tuning and snugging the post, not for big lifts. If a beam needs to come up more than a little, raise it with temporary jacks first, then set the permanent post.

Either way, go slowly. Spread small turns over days or weeks. Lifting too fast can crack drywall, plaster and tile upstairs, and can stick doors and windows.

Do I need a permit or inspection?

Many areas require a permit for permanent support posts, and some inspectors require specific post types. Check with your local building department before you buy materials.

How do I keep the post from rusting?

Paint the pipe and plates with a rust-inhibiting metal primer and paint, especially in damp basements and crawl spaces.

Ordering

I'm a contractor building several posts. Can you help?

Yes. Send us your list of parts and quantities and we'll put together a quote.

11-gauge jack post adjuster dimension diagram

DIY 3 inch 11 Gauge Jack Post Adjuster 

Fits 3" O.D. 11 gauge steel tube and adjusts up to 4". Pipe and plates sold separately, or buy it bundled with an H plate.

Go to Product
Schedule 40 jack post adjuster diagram showing rod and base plate dimensions

DIY 3-1/2 inch Schedule 40 Jack Post Adjuster

Fits 3-1/2" O.D. Schedule 40 pipe (3" nominal) and adjusts up to 4". For heavier loads or jobs that call for Schedule 40.

Go to Product
Jack post H-plate diagram showing dimensions and mounting holes

DIY H Plate for Jack Post

A top or base plate made to weld onto the pipe. The H tabs bend over for a snug fit, with nail holes and four 3/8" bolt holes.

Go to Product